|
The performance of our engineers is professional. Strict adherence to company standards and procedures must be followed in the development of all projects. As a result, design projects have been completed on time and in a satisfactory manner. Quality is demonstrated by the close bid spreads resulting from the contractor's bidding on our construction documents. The thoroughness with which they have been prepared has consistently resulted in bid spreads of ten percent or less among the responsive bidders. In addition to the close bid spreads among low bidders, the opinion of probable construction costs prepared by Adena also reflect a similar accuracy.
Adena uses proven business methods to transfer information. These methods reduce wasted time when trying to define the problem and reach decisions. Written conference agenda can be sent to the client prior to the meeting so the goals of the meeting are known. Meetings, telephone conversations and decisions affecting the project are documented through conference memoranda prepared by the Adena Project Manager. These constitute a record of the decisions that are distributed to the design team for their guidance.
|